From a document to usable vehicle data
A scanned CoC or PDF is useful for reading, but does not provide an IVI message. Start with controlled manufacturer data: VIN, type approval, type, variant, version and applicable technical characteristics. Keep the source evidence and the exported file together so discrepancies can be traced. SignECOC checks, signs and submits prepared XML through supported channels; it does not author the manufacturer's declaration.
Before you continue
- Identify the vehicle and its applicable approval.
- Distinguish the readable document from the structured XML.
- Check destination requirements before choosing a workflow.
Is an eCoC the same as a registration certificate?
No. Conformity data supports the process, while vehicle registration is a separate decision by the competent national authority. A file, signature or submission receipt does not itself prove registration.